Warning: mkdir(): No space left on device in /www/wwwroot/Z4.com/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/ntlkfj.com/cache/b7/c6cb6/1e42d.html): failed to open stream: No such file or directory in /www/wwwroot/Z4.com/func.php on line 115
Upgrading and renovating the remote control system of the sewage treatment equipment (Changle Sewage批发,Upgrading and renovating the remote control system of the sewage treatment equipment (Changle Sewage供应,Upgrading and renovating the remote control system of the sewage treatment equipment (Changle Sewage生产厂家详细介绍_Henan Lanyi Intelligent Technology Co., Ltd








  • 羞羞视频免费入口,男女羞羞网站,羞羞视频网页,羞羞视频APP污下载

    + WeChat:切换按钮及底部微信

    Welcome to visit the website of Henan Lanyi Intelligent Technology Co., Ltd

    Contact 13323711188

    You Are Here:Home> Product Center >Engineering Case>Industrial wastewater treatment case
    Upgrading and renovating the remote control system

    Upgrading and renovating the remote control system of the sewage treatment equipment (Changle Sewage

    The remote control system upgrade and renovation of the sewage treatment equipment (Changle Wastewater Treatment Plant) has achieved good results in sewage treatment. The daily processing capacity of Changle Wastewater Treatment Plant is 50000 tons, and the following Blue One Environmental Protection is the site of the upgrade and renovation of the sewage control system and pump station in Changle

        The remote control system upgrade and renovation of the sewage treatment equipment (Changle Wastewater Treatment Plant) has achieved good results in sewage treatment. The daily processing capacity of Changle Wastewater Treatment Plant is 50000 tons, and the following Blue One Environmental Protection is the site of the upgrade and renovation of the sewage control system and pump station in Changle Wastewater Treatment Plant.

        The upgraded and renovated sewage treatment plant has a clearer remote control room for sewage treatment control.

        The electrical control cabinet of the Blue One Blue One sewage treatment system in the main electrical control room of the sewage treatment plant.

    • Telephones:0371-88912366 0371-88912399

    • Service Hotline:4006096637(technology)

    • Address:Unit 303, Building 5, Zhangwuzhai No.2 Courtyard, Sequoia Road, Zhengzhou High tech Zone, Henan Province

    • Add WeChat

    Copyright Notice: The content published on this website may not be downloaded, reproduced or mirrored without the permission of this website and the author. Violators will be held legally responsible by this website.
    网站地图