Warning: mkdir(): No space left on device in /www/wwwroot/Z4.com/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/ntlkfj.com/cache/9a/3848c/54843.html): failed to open stream: No such file or directory in /www/wwwroot/Z4.com/func.php on line 115
Blue One Integrated Medical Equipment moves into Lidun Health Center批发,Blue One Integrated Medical Equipment moves into Lidun Health Center供应,Blue One Integrated Medical Equipment moves into Lidun Health Center生产厂家详细介绍_








  • 羞羞视频免费入口,男女羞羞网站,羞羞视频网页,羞羞视频APP污下载

    +WeChat:切换按钮及底部微信

    Welcome to the website of Blue One Environmental Protection Technology Co., Ltd!

    Contact 13323711188

    You Are Here:Home> Product Center >Engineering Case>Medical wastewater treatment case
    Blue One Integrated Medical Equipment moves into L

    Blue One Integrated Medical Equipment moves into Lidun Health Center

    The medical wastewater treatment equipment of Lanyi Environmental Protection has been moved into the Lidun Central Health Center in Zhouning County. The center has received local environmental improvement measures and needs medical wastewater treatment manufacturers to actively respond to local environmental protection measures.

        The medical wastewater treatment equipment of Lanyi Environmental Protection has been moved into the Lidun Central Health Center in Zhouning County. The center has received local environmental improvement measures and needs medical wastewater treatment manufacturers to actively respond to local environmental protection measures. Lanyi has dispatched relevant technical personnel to the site for consultation, inspection, calculation, sampling, testing, and analysis to formulate the relevant medical wastewater treatment plan for the Lidun Central Health Center in Zhouning County. The integrated medical wastewater treatment equipment purchased by the Lidun Central Health Center is a combination of Lanyi Environmental Protection Technology Department and construction team, which uses Lanyi ozone disinfection equipment and biochemical membrane block treatment technology instead of traditional chlorine dioxide disinfection equipment to solve the problem of hydrochloric acid required for chlorine dioxide disinfection equipment. The problem of difficulty in purchasing drugs, And it also saved the cost of drugs. The Blue One Environmental Protection Integrated Sewage Treatment Equipment has a small footprint and excellent sewage treatment process! Easy to operate and low operating costs! Having a dominant advantage in the bidding process.

        The underground integrated medical equipment produced by Blue One not only has a small daily loss, saves medication and electricity, but also meets local discharge standards for daily wastewater treatment.

        The integrated buried medical wastewater is buried underground, and there is a fence around the equipment. When planting flowers and plants above the equipment, the hospital should not consider the purchased medical wastewater treatment equipment as unsightly. And there are people above each medical wastewater storage tank equipment to facilitate daily observation of the water quality of medical wastewater treatment equipment.

        The equipment that leaks above the buried integrated medical equipment is treated with special measures to prevent corrosion and rain

        The integrated ozone generator adopts fully automatic control, which allows for more time for free control. It does not require manual operation and only needs to be debugged by the manufacturer. After adjustment, it can be used.
    • Telephones:0371-88912366 0371-88912399

    • Service Hotline:4006096637(technology)

    • Address:Building 3, Dingxiang County, High tech Industrial Development Zone, Zhengzhou City, Henan Province

    • Add WeChat

    Copyright Notice: The content published on this website may not be downloaded, reproduced or mirrored without the permission of this website and the author. Violators will be held legally responsible by this website.
    网站地图